More front end bits...
New headbearings in, I use the straight sections of some old tubes to align the triples.
Marking out the damper rod....and drilling new bypass-holes.
What was the assembly sequence again?
Stock Intiminator on the right, modded on the left.
(there are more mods than what's visible in this pic)
As of tonight, the front end is back together. Ashley Martin (Bob Martin's brother....soon to be living and operating from Tassie ) did a great job getting the tiny 0.5-0.8mm bend out of the slider legs...
Also checked the triples, which turned out to be on-the-money !
We've got a rolling "nekkid"....still gotta fix that slightly bent subframe.
New headbearings in, I use the straight sections of some old tubes to align the triples.
Marking out the damper rod....and drilling new bypass-holes.
What was the assembly sequence again?
Stock Intiminator on the right, modded on the left.
(there are more mods than what's visible in this pic)
As of tonight, the front end is back together. Ashley Martin (Bob Martin's brother....soon to be living and operating from Tassie ) did a great job getting the tiny 0.5-0.8mm bend out of the slider legs...
Also checked the triples, which turned out to be on-the-money !
We've got a rolling "nekkid"....still gotta fix that slightly bent subframe.